Cheshire East Local Plan StrategyLocal Development Scheme

The Local Development Scheme sets out a programme and timetable for the preparation of documents for the Cheshire East Local Plan during the period 2016 - 18.  Progress with the preparation of the Local Plan documents will be reviewed annually as part of the Local Plan The Annual Monitoring Report.  The Local Development Scheme will be updated in the light of this review and at such other times when circumstances require a change to the timetable for the preparation of documents.  The current scheme came into effect on 17 October 2016.

Previous versions of the Local Development Scheme

Previous versions of the Local Development Scheme are also available for information.