Impact: Medium | | 01/11/2020 | 31/12/2024 | Cheshire East Council |
Impact: High | | 19/07/2022 | 28/08/2025 | Cheshire East Council |
Impact: High | | 16/01/2023 | 15/07/2025 | Network Rail Infrastructure Ltd |
Impact: Medium | | 22/01/2024 | 06/09/2024 | United Utilities Water |
Impact: High | Carriageway - Reconstruction/Repair - M6 northbound Junction 17 to Junction 17 - carriageway closure for carriageway - reconstruction/renewal Roadworks scheduled 02/02/2024 - 31/03/2025 (National Highways)
| 02/02/2024 | 31/03/2025 | National Highways |
Impact: High | Mill Farm Drive, Crewe. Emergency access will be maintained where possible Road closure scheduled 29/02/2024 - 31/12/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 29/02/2024 | 31/12/2024 | Cheshire East Council |
Impact: High | | 10/04/2024 | 31/07/2024 | Cheshire East Council |
Impact: Medium | | 01/05/2024 | 31/08/2024 | Cheshire East Council |
Impact: Low | Peckforton Hall Lane, Nantwich. Emergency access will be maintained where possible Road closure scheduled 03/05/2024 - 23/07/2024 due to Roadworks / License - Roadworks works (United Utilities Water)
| 03/05/2024 | 23/07/2024 | United Utilities Water |
Impact: High | | 08/05/2024 | 11/07/2024 | Cadent |
Impact: High | | 17/05/2024 | 30/11/2024 | Cheshire East Council |
Impact: Medium | | 20/05/2024 | 15/07/2024 | Cheshire East Council |
Impact: Medium | Smithy Lane, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 28/05/2024 - 20/08/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 28/05/2024 | 20/08/2024 | Cheshire East Council |
Impact: High | | 28/05/2024 | 20/08/2024 | Cheshire East Council |
Impact: High | | 03/06/2024 | 09/07/2024 | Cadent |
Impact: High | Installation of new drainage pipes and gullies, along with resurfacing of the carriageway 24/7 Roadworks scheduled 03/06/2024 - 12/10/2024 (Cheshire East Council)
| 03/06/2024 | 12/10/2024 | Cheshire East Council |
Impact: High | | 03/06/2024 | 12/10/2024 | Cheshire East Council |
Impact: Medium | Gas mains reinforcement works, Lay new 125mm PE Main via open cut method Roadworks scheduled 03/06/2024 - 17/07/2024 (Cadent) - Traffic control (two-way signals)
| 03/06/2024 | 17/07/2024 | Cadent |
Impact: High | | 04/06/2024 | 29/07/2024 | Cadent |
Impact: High | | 10/06/2024 | 10/06/2025 | Cheshire East Council |
Impact: Medium | | 10/06/2024 | 10/06/2025 | Cheshire East Council |
Impact: Medium | O/s 93 & 103 1.2mx1.2m service excavation - supply LV mains
. 35-43 , 45-61, 64-74 - 1.2mx1.2m service excavation - supply LV mains.
63-69 track works - supply LV mains Roadworks scheduled 12/06/2024 - 12/07/2024 (SP Energy Networks)
| 12/06/2024 | 12/07/2024 | SP Energy Networks |
Impact: High | Padgbury Lane, Congleton. Emergency access will be maintained where possible Road closure scheduled 12/06/2024 - 23/08/2024 due to Roadworks / License - Roadworks works (United Utilities Water)
| 12/06/2024 | 23/08/2024 | United Utilities Water |
Impact: Medium | | 12/06/2024 | 12/08/2024 | Cheshire East Council |
Impact: Medium | | 13/06/2024 | 09/07/2024 | SP Energy Networks |
Impact: High | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 13/06/2024 - 12/07/2024 (Cadent) - Traffic control (two-way signals)
| 13/06/2024 | 12/07/2024 | Cadent |
Impact: High | | 17/06/2024 | 19/07/2024 | Cheshire East Council |
Impact: High | | 20/06/2024 | 30/07/2024 | SP Energy Networks |
Impact: High | | 24/06/2024 | 16/07/2024 | Cheshire East Council |
Impact: Medium | | 25/06/2024 | 16/07/2025 | SP Energy Networks |
Impact: Medium | | 26/06/2024 | 05/07/2024 | United Utilities Water |
Impact: Medium | | 27/06/2024 | 23/07/2024 | SP Energy Networks |
Impact: High | | 28/06/2024 | 17/07/2024 | United Utilities Water |
Impact: Medium | Toilet on site 28-6-24 from 15:30 till 17:00 on the 04.07.24, taking over from RTS permit. two way lights from 30.06.24 - 05.07.24. Chater 8 barriers and signage on site around toilet and cabinet/ excavation . Cab & pole land works. No works to take place on 04.07.24 due to election, works to commence on 05.07.24. Roadworks scheduled 28/06/2024 - 05/07/2024 (Vodafone Group) - Traffic control (two-way signals)
| 28/06/2024 | 05/07/2024 | Vodafone Group |
Impact: High | | 01/07/2024 | 05/07/2024 | United Utilities Water |
Impact: High | Smithy Lane, Crewe. Emergency access will be maintained where possible Road closure scheduled 01/07/2024 - 05/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 01/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: High | Buxton Road, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 01/07/2024 - 05/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 01/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: Medium | | 01/07/2024 | 05/07/2024 | SP Energy Networks |
Impact: Medium | | 01/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: High | | 01/07/2024 | 05/07/2024 | United Utilities Water |
Impact: High | | 01/07/2024 | 05/07/2024 | United Utilities Water |
Impact: High | | 01/07/2024 | 05/07/2024 | SP Energy Networks |
Impact: High | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 01/07/2024 - 09/07/2024 (Cadent) - Traffic control (multi-way signals)
| 01/07/2024 | 09/07/2024 | Cadent |
Impact: Medium | | 01/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: High | | 01/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: High | | 01/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: High | | 01/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: High | | 02/07/2024 | 06/07/2024 | BT |
Impact: High | | 02/07/2024 | 05/07/2024 | BT |
Impact: High | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 02/07/2024 - 10/07/2024 (Cadent) - Traffic control (two-way signals)
| 02/07/2024 | 10/07/2024 | Cadent |
Impact: Medium | | 02/07/2024 | 08/07/2024 | BT |
Impact: Medium | IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER SERVICE AT DEPTH OF UNDER 1.5 METRES BY HAND DIG IN FOOTWAY Roadworks scheduled 02/07/2024 - 08/07/2024 (United Utilities Water)
| 02/07/2024 | 08/07/2024 | United Utilities Water |
Impact: High | | 02/07/2024 | 08/07/2024 | SP Energy Networks |
Impact: High | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 02/07/2024 - 10/07/2024 (Cadent) - Traffic control (two-way signals)
| 02/07/2024 | 10/07/2024 | Cadent |
Impact: High | | 02/07/2024 | 09/08/2024 | SP Energy Networks |
Impact: Medium | | 03/07/2024 | 05/07/2024 | BT |
Impact: Medium | | 03/07/2024 | 09/07/2024 | Electricity North West Limited |
Impact: High | Fourth Avenue, Crewe. Emergency access will be maintained where possible Road closure scheduled 03/07/2024 - 23/07/2024 due to Roadworks / License - Roadworks works (SP Energy Networks)
| 03/07/2024 | 23/07/2024 | SP Energy Networks |
Impact: High | | 03/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: Medium | | 03/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: Medium | | 03/07/2024 | 05/07/2024 | BT |
Impact: Medium | | 03/07/2024 | 09/07/2024 | SP Energy Networks |
Impact: Medium | | 03/07/2024 | 09/07/2024 | United Utilities Water |
Impact: Medium | | 03/07/2024 | 05/07/2024 | United Utilities Water |
Impact: Medium | | 03/07/2024 | 09/07/2024 | United Utilities Water |
Impact: Medium | | 03/07/2024 | 09/07/2024 | SP Energy Networks |
Impact: Medium | | 04/07/2024 | 08/07/2024 | BT |
Impact: Medium | | 04/07/2024 | 08/07/2024 | BT |
Impact: Medium | | 04/07/2024 | 18/07/2024 | United Utilities Water |
Impact: High | | 04/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: High | | 04/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: High | | 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | | 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: High | | 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | | 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: High | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 04/07/2024 - 12/07/2024 (Cadent) - Traffic control (two-way signals)
| 04/07/2024 | 12/07/2024 | Cadent |
Impact: Medium | | 04/07/2024 | 05/07/2024 | United Utilities Water |
Impact: Medium | IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER SERVICE AT DEPTH OF UNDER 1.5 METRES BY HAND AND MACHINE DIG IN CARRIAGEWAY Roadworks scheduled 04/07/2024 - 10/07/2024 (United Utilities Water)
| 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | | 04/07/2024 | 05/07/2024 | United Utilities Water |
Impact: Medium | | 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER MAIN AT DEPTH OF UNDER 1.5 METRES BY HAND DIG IN FOOTWAY Roadworks scheduled 04/07/2024 - 10/07/2024 (United Utilities Water)
| 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER SERVICE AT DEPTH OF UNDER 1.5 METRES BY HAND AND MACHINE DIG IN CARRIAGEWAY Roadworks scheduled 04/07/2024 - 10/07/2024 (United Utilities Water)
| 04/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | Reason : Roadworks. Status : Currently Active. Period : from 20:56 on 4 July 2024 to 05:00 on 5 July 2024. Lanes Closed : All lanes are closed Roadworks scheduled 04/07/2024 - 05/07/2024 (National Highways)
| 04/07/2024 | 05/07/2024 | National Highways |
Impact: Medium | | 05/07/2024 | 09/07/2024 | BT |
Impact: Medium | NANTWICH-1140241-10m Duct and Boxes,Maintenance Dig in FW/VERGE Roadworks scheduled 05/07/2024 - 09/07/2024 (BT)
| 05/07/2024 | 09/07/2024 | BT |
Impact: High | EXCAVATE IN THE FOOTWAY TO INSTALL APPROX 60M OF DUCT, CHAMBERS AND TEES Roadworks scheduled 05/07/2024 - 11/07/2024 (Nexfibre) - Traffic control (multi-way signals)
| 05/07/2024 | 11/07/2024 | Nexfibre |
Impact: Medium | | 05/07/2024 | 18/07/2024 | VX Fiber Limited |
Impact: Medium | | 05/07/2024 | 05/07/2024 | National Highways |
Impact: Medium | | 05/07/2024 | 09/07/2024 | Zzoomm PLC |
Impact: Medium | | 05/07/2024 | 10/07/2024 | Nexfibre |
Impact: High | | 05/07/2024 | 05/07/2024 | SP Energy Networks |
Impact: Medium | | 05/07/2024 | 05/07/2024 | United Utilities Water |
Impact: Medium | | 05/07/2024 | 11/07/2024 | Electricity North West Limited |
Impact: Medium | Excavate joint bay in footway to install and joint cable new service connection to car charging point located on private land. Roadworks scheduled 05/07/2024 - 11/07/2024 (Electricity North West Limited)
| 05/07/2024 | 11/07/2024 | Electricity North West Limited |
Impact: Medium | Maintenance dig required in the footway on existing BT duct to clear blockage for new cable, service affecting Roadworks scheduled 05/07/2024 - 09/07/2024 (BT)
| 05/07/2024 | 09/07/2024 | BT |
Impact: Medium | | 05/07/2024 | 05/07/2024 | Cheshire East Council |
Impact: High | | 05/07/2024 | 08/07/2024 | United Utilities Water |
Impact: High | | 06/07/2024 | 07/07/2024 | United Utilities Water |
Impact: Medium | | 06/07/2024 | 07/07/2024 | United Utilities Water |
Impact: High | Elton Road, Sandbach. Emergency access will be maintained where possible Road closure scheduled 06/07/2024 - 10/07/2024 due to Roadworks / License - Roadworks works (Nexfibre)
| 06/07/2024 | 10/07/2024 | Nexfibre |
Impact: Medium | Excavation in the footway to connect existing bt chamber to customers property with new underground duct, service affective. Roadworks scheduled 06/07/2024 - 10/07/2024 (BT)
| 06/07/2024 | 10/07/2024 | BT |
Impact: Medium | Excavation in the footway to connect existing bt chamber to customers property with new underground duct, service affective. Roadworks scheduled 06/07/2024 - 10/07/2024 (BT)
| 06/07/2024 | 10/07/2024 | BT |
Impact: Medium | | 06/07/2024 | 07/07/2024 | LIGHTSPEED NETWORKS LTD |
Impact: Medium | | 06/07/2024 | 06/07/2024 | Cheshire East Council |
Impact: High | | 06/07/2024 | 06/07/2024 | Cheshire East Council |
Impact: Medium | | 07/07/2024 | 07/07/2024 | United Utilities Water |
Impact: High | | 07/07/2024 | 07/07/2024 | SP Energy Networks |
Impact: Medium | | 07/07/2024 | 07/07/2024 | United Utilities Water |
Impact: High | | 07/07/2024 | 07/07/2024 | BT |
Impact: High | | 07/07/2024 | 07/07/2024 | BT |
Impact: High | | 07/07/2024 | 07/07/2024 | United Utilities Water |
Impact: High | | 07/07/2024 | 07/07/2024 | Cadent |
Impact: High | Green Lane, Nantwich. Emergency access will be maintained where possible Road closure scheduled 07/07/2024 - 07/07/2024 due to Roadworks / License - Roadworks works (BT)
| 07/07/2024 | 07/07/2024 | BT |
Impact: Medium | | 07/07/2024 | 09/07/2024 | National Highways |
Impact: Medium | | 08/07/2024 | 10/07/2024 | BT |
Impact: High | | 08/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | (material storage), permit for spoil storage only Roadworks scheduled 08/07/2024 - 10/07/2024 (SP Energy Networks)
| 08/07/2024 | 10/07/2024 | SP Energy Networks |
Impact: Medium | TRIAL HOLE - To confirm route, size and material of main Roadworks scheduled 08/07/2024 - 10/07/2024 (Cadent)
| 08/07/2024 | 10/07/2024 | Cadent |
Impact: High | Diversion to be symbolised (8-12 Jul 24). Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 12/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | | 08/07/2024 | 10/07/2024 | SP Energy Networks |
Impact: Medium | | 08/07/2024 | 08/07/2024 | SP Energy Networks |
Impact: Medium | | 08/07/2024 | 10/07/2024 | SP Energy Networks |
Impact: Medium | EXCATAE IN THE FOOTWAY TO INSTALL APPROX 110M OF DUCT IN THE FOOTWAY, TWO CHAMBERS AND A CARRIAGWAY CROSSING Roadworks scheduled 08/07/2024 - 12/07/2024 (Nexfibre) - Traffic control (multi-way signals)
| 08/07/2024 | 12/07/2024 | Nexfibre |
Impact: Medium | | 08/07/2024 | 08/07/2024 | Utility Distribution Networks Ltd. |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Nexfibre |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Cadent |
Impact: Medium | | 08/07/2024 | 12/07/2024 | BT |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Electricity North West Limited |
Impact: Medium | | 08/07/2024 | 10/07/2024 | BT |
Impact: Medium | | 08/07/2024 | 10/07/2024 | BT |
Impact: High | | 08/07/2024 | 11/07/2024 | United Utilities Water |
Impact: High | Harthill Lane, Nantwich. Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 08/07/2024 due to Roadworks / License - Roadworks works (SP Energy Networks)
| 08/07/2024 | 08/07/2024 | SP Energy Networks |
Impact: High | | 08/07/2024 | 08/07/2024 | SP Energy Networks |
Impact: High | | 08/07/2024 | 16/07/2024 | SP Energy Networks |
Impact: High | Excavate joint bay with 12 metres of track in the footway and carriageway to install and joint cable for new service connection to car charging point located on private land. Followed by disconnection. Roadworks scheduled 08/07/2024 - 12/07/2024 (Electricity North West Limited) - Traffic control (two-way signals)
| 08/07/2024 | 12/07/2024 | Electricity North West Limited |
Impact: High | | 08/07/2024 | 10/07/2024 | Cadent |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | Cross Lane, Crewe. Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 09/07/2024 due to Roadworks / License - Roadworks works (United Utilities Water)
| 08/07/2024 | 09/07/2024 | United Utilities Water |
Impact: Medium | | 08/07/2024 | 22/07/2024 | SP Energy Networks |
Impact: High | | 08/07/2024 | 22/07/2024 | SP Energy Networks |
Impact: High | | 08/07/2024 | 19/07/2024 | United Utilities Water |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | Brookhouse Road, Alsager. Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 12/07/2024 due to Roadworks / License - Roadworks works (Utility Distribution Networks Ltd.)
| 08/07/2024 | 12/07/2024 | Utility Distribution Networks Ltd. |
Impact: Medium | Forward Planning - Highway maintenance / improvement works (Dates to be confirmed) Roadworks / License - Roadworks scheduled 08/07/2024 - 12/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: Medium | | 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | | 08/07/2024 | 10/07/2024 | Cheshire East Council |
Impact: High | | 08/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | Queens Drive, Nantwich. Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 10/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/07/2024 | 10/07/2024 | Cheshire East Council |
Impact: High | London Road, Sandbach. Emergency access will be maintained where possible Road closure scheduled 08/07/2024 - 08/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/07/2024 | 08/07/2024 | Cheshire East Council |
Impact: Medium | | 08/07/2024 | 09/07/2024 | National Highways |
Impact: Medium | MACCLESFIELD - 1124082 23m of duct overlay and a new JUF4 on existing split coupling in footway, carriageway Roadworks scheduled 09/07/2024 - 11/07/2024 (BT)
| 09/07/2024 | 11/07/2024 | BT |
Impact: Medium | | 09/07/2024 | 11/07/2024 | BT |
Impact: High | | 09/07/2024 | 11/07/2024 | BT |
Impact: Medium | No rope on arrival Will require dig down, swept T to pole on duct line. No rope linking JUF 10 to JUF 4, Rodded both ways and hit blockage at swept T. Will require dig down, Requires mech lifter for the box But looking through with head torch can see it’s full with silt, Also requires mech lifter. Again looking through looks to silted and a a gully suck required Roadworks scheduled 09/07/2024 - 11/07/2024 (Fibre Assets Ltd) - Traffic control (two-way signals)
| 09/07/2024 | 11/07/2024 | Fibre Assets Ltd |
Impact: Medium | Mandatory gas disconnection under the Gas Safety (Installation & Use) Regulations 16(3)b. A primary meter has been removed and we h ave to disconnect the supply to the building in compliance with these regulations. Roadworks scheduled 09/07/2024 - 11/07/2024 (Cadent) - Traffic control (two-way signals)
| 09/07/2024 | 11/07/2024 | Cadent |
Impact: Medium | | 09/07/2024 | 11/07/2024 | BT |
Impact: Medium | | 09/07/2024 | 11/07/2024 | BT |
Impact: Medium | IME TO CONNECT PROJECT EXCAVATE & REINSTATE 1 X JOINTBAY, ROAD CROSSING AND LAY 13M CABLE Roadworks scheduled 09/07/2024 - 15/07/2024 (SP Energy Networks)
| 09/07/2024 | 15/07/2024 | SP Energy Networks |
Impact: High | | 09/07/2024 | 11/07/2024 | BT |
Impact: High | | 09/07/2024 | 09/07/2024 | Electricity North West Limited |
Impact: High | Notice for information purposes only, with no excavation works required, activities will include road closure to facilitate in vegetation management around our overhead network Roadworks scheduled 09/07/2024 - 09/07/2024 (Electricity North West Limited)
| 09/07/2024 | 09/07/2024 | Electricity North West Limited |
Impact: High | Notice for information purposes only, with no excavation works required, activities will include road closure to facilitate in vegetation management around our overhead network Roadworks scheduled 09/07/2024 - 09/07/2024 (Electricity North West Limited)
| 09/07/2024 | 09/07/2024 | Electricity North West Limited |
Impact: High | Notice for information purposes only, with no excavation works required, activities will include Road Closure to facilitate in vegetation management around our overhead network Roadworks scheduled 09/07/2024 - 09/07/2024 (Electricity North West Limited)
| 09/07/2024 | 09/07/2024 | Electricity North West Limited |
Impact: High | Newtons Lane, Crewe. Emergency access will be maintained where possible Road closure scheduled 09/07/2024 - 09/07/2024 due to Roadworks / License - Roadworks works (SP Energy Networks)
| 09/07/2024 | 09/07/2024 | SP Energy Networks |
Impact: High | | 09/07/2024 | 11/07/2024 | United Utilities Water |
Impact: High | | 09/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | | 09/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | | 09/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: High | | 09/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: Medium | Excavation in the footway to connect existing bt chamber to customers property with new underground duct, service affective. Roadworks scheduled 09/07/2024 - 11/07/2024 (BT)
| 09/07/2024 | 11/07/2024 | BT |
Impact: High | | 09/07/2024 | 11/07/2024 | Cheshire East Council |
Impact: High | Whitchurch Road, Nantwich. Emergency access will be maintained where possible Road closure scheduled 09/07/2024 - 11/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 09/07/2024 | 11/07/2024 | Cheshire East Council |
Impact: High | | 09/07/2024 | 11/07/2024 | Cheshire East Council |
Impact: High | | 09/07/2024 | 09/07/2024 | BT |
Impact: Medium | | 09/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: Medium | | 09/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: High | Plant Hawthorne Plants, topsoil and remove debris 09:30-15:00 Roadworks scheduled 09/07/2024 - 09/07/2024 (Cheshire East Council) - Traffic control (two-way signals)
| 09/07/2024 | 09/07/2024 | Cheshire East Council |
Impact: Medium | | 10/07/2024 | 11/07/2024 | BT |
Impact: High | | 10/07/2024 | 11/07/2024 | BT |
Impact: Medium | | 10/07/2024 | 10/07/2024 | National Highways |
Impact: Medium | Excavate to install approx. 8m telecoms duct between existing telecoms chambers, to link into existing telecoms apparatus Roadworks scheduled 10/07/2024 - 12/07/2024 (Zzoomm PLC) - Traffic control (multi-way signals)
| 10/07/2024 | 12/07/2024 | Zzoomm PLC |
Impact: High | Excavation for new service. Chapter 8 required. Footpath close signs. Spoil to be stored within barriers. Dispensation required from the LA for parking on double yellows. 30MPH road. Roadworks scheduled 10/07/2024 - 16/07/2024 (Electricity North West Limited) - Traffic control (two-way signals)
| 10/07/2024 | 16/07/2024 | Electricity North West Limited |
Impact: High | | 10/07/2024 | 12/07/2024 | United Utilities Water |
Impact: Medium | | 10/07/2024 | 12/07/2024 | Virgin Media |
Impact: High | | 10/07/2024 | 12/07/2024 | Virgin Media |
Impact: Medium | Maintenance excavation on the F/W, C/W and Soft to install new BT/Openreach duct. Roadworks scheduled 10/07/2024 - 12/07/2024 (BT)
| 10/07/2024 | 12/07/2024 | BT |
Impact: High | | 10/07/2024 | 16/07/2024 | Cheshire East Council |
Impact: Medium | | 10/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | | 10/07/2024 | 10/07/2024 | United Utilities Water |
Impact: Medium | Excavation in the footway to connect existing bt chamber to customers property with new underground duct, service affective. Roadworks scheduled 10/07/2024 - 12/07/2024 (BT)
| 10/07/2024 | 12/07/2024 | BT |
Impact: Medium | | 10/07/2024 | 23/07/2024 | BT |
Impact: High | | 10/07/2024 | 10/07/2024 | United Utilities Water |
Impact: High | | 10/07/2024 | 10/07/2024 | Cheshire East Council |
Impact: High | Ardenbrook Rise, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 10/07/2024 - 10/07/2024 due to Roadworks / License - Roadworks works (BT)
| 10/07/2024 | 10/07/2024 | BT |
Impact: High | | 10/07/2024 | 16/07/2024 | Cheshire East Council |
Impact: Medium | | 11/07/2024 | 12/07/2024 | United Utilities Water |
Impact: Medium | | 11/07/2024 | 12/07/2024 | BT |
Impact: High | | 11/07/2024 | 11/07/2024 | United Utilities Water |
Impact: Medium | | 11/07/2024 | 15/07/2024 | United Utilities Water |
Impact: Medium | | 11/07/2024 | 15/07/2024 | Nexfibre |
Impact: Medium | | 11/07/2024 | 11/07/2024 | BT |
Impact: Medium | | 11/07/2024 | 17/07/2024 | SP Energy Networks |
Impact: High | | 11/07/2024 | 11/07/2024 | SP Energy Networks |
Impact: Medium | EXCAVATE IN THE FOOTWAY TO BUILD A NEW CHAMBER, A 6M CARRIAGWAY CROSSING AND 1 TEE Roadworks scheduled 11/07/2024 - 17/07/2024 (Nexfibre) - Traffic control (multi-way signals)
| 11/07/2024 | 17/07/2024 | Nexfibre |
Impact: Medium | | 11/07/2024 | 17/07/2024 | Electricity North West Limited |
Impact: Medium | | 11/07/2024 | 17/07/2024 | Electricity North West Limited |
Impact: High | | 11/07/2024 | 15/07/2024 | Electricity North West Limited |
Impact: Medium | | 11/07/2024 | 11/07/2024 | Airband Community Internet Ltd |
Impact: High | | 11/07/2024 | 15/07/2024 | Cheshire East Council |
Impact: Medium | Access to BT boxes/Manholes to recover redundant cables and clear duct space, rolling works with no excavation Roadworks scheduled 11/07/2024 - 13/07/2024 (BT) - Traffic control (two-way signals)
| 11/07/2024 | 13/07/2024 | BT |
Impact: Medium | Access to BT boxes/Manholes to recover redundant cables and clear duct space, rolling works with no excavation Roadworks scheduled 11/07/2024 - 13/07/2024 (BT) - Traffic control (two-way signals)
| 11/07/2024 | 13/07/2024 | BT |
Impact: High | Structure - Maintenance - M6 northbound Jct 15 to Jct 18. Carriageway closure for maintenance works. Diversion via National Highways and local authority works. Road closure scheduled 11/07/2024 - 12/07/2024 (National Highways) - M6 northbound Jct 16 entry slip road closure
| 11/07/2024 | 12/07/2024 | National Highways |
Impact: Medium | | 12/07/2024 | 17/07/2024 | Cadent |
Impact: Medium | | 12/07/2024 | 12/07/2024 | Cheshire East Council |
Impact: Medium | | 12/07/2024 | 18/07/2024 | Electricity North West Limited |
Impact: Medium | | 12/07/2024 | 15/07/2024 | Virgin Media |
Impact: High | | 12/07/2024 | 12/07/2024 | Electricity North West Limited |
Impact: High | Weston Road Service Road, Crewe. Emergency access will be maintained where possible Road closure scheduled 12/07/2024 - 26/07/2024 due to Roadworks / License - Roadworks works (SP Energy Networks)
| 12/07/2024 | 26/07/2024 | SP Energy Networks |
Impact: Medium | | 12/07/2024 | 12/07/2024 | United Utilities Water |
Impact: High | | 12/07/2024 | 13/07/2024 | National Highways |
Impact: High | Horticulture (cutting and planting) - M6 northbound and southbound jct 18 - 21 lane closures and carriageway closures due to maintenance Road closure scheduled 12/07/2024 - 16/07/2024 (National Highways) - M56 Westbound to M6 northbound link road closure
| 12/07/2024 | 16/07/2024 | National Highways |
Impact: High | Dane Bank Avenue, Crewe. Emergency access will be maintained where possible Road closure scheduled 13/07/2024 - 14/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 13/07/2024 | 14/07/2024 | Cheshire East Council |
Impact: Medium | | 14/07/2024 | 14/07/2024 | United Utilities Water |
Impact: Medium | | 14/07/2024 | 14/07/2024 | United Utilities Water |
Impact: High | | 14/07/2024 | 14/07/2024 | United Utilities Water |
Impact: High | Sudlow Lane, Knutsford. Emergency access will be maintained where possible Road closure scheduled 15/07/2024 - 19/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: Medium | EXCAVATE IN THE FOOTWAY TO INSTALL APOROX 350M OF FOOTWAY DUCT, 130M OF VERGE, 40 TEES, 5 CHAMBERS AND A FOOTBOLLARD Roadworks scheduled 15/07/2024 - 19/07/2024 (Nexfibre) - Traffic control (multi-way signals)
| 15/07/2024 | 19/07/2024 | Nexfibre |
Impact: Medium | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 19/07/2024 | United Utilities Water |
Impact: Medium | | 15/07/2024 | 15/07/2024 | United Utilities Water |
Impact: High | S50 works to lay new electricity mains and connect to existing mains. Works completed by Utility Pro Solutions Ltd. Emergency contact 03301075686 Roadworks scheduled 15/07/2024 - 19/07/2024 (Cheshire East Council)
| 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 19/07/2024 | Cadent |
Impact: Medium | Fault repair works to put an end to an unplanned interruption of a Scottish Power Electricity supply cables including excavation and reinstatement Roadworks scheduled 15/07/2024 - 17/07/2024 (SP Energy Networks) - Traffic control (multi-way signals)
| 15/07/2024 | 17/07/2024 | SP Energy Networks |
Impact: Medium | Gas mains diversion works, divert existing 125mm PE main to accommodate formation of a new site entrance Abn 125 mm PE lay New 125m m main via open cut method Roadworks scheduled 15/07/2024 - 26/07/2024 (Cadent) - Traffic control (two-way signals)
| 15/07/2024 | 26/07/2024 | Cadent |
Impact: High | Mandatory gas disconnection under the Gas Safety (Installation & Use) Regulations 16(3)b. A primary meter has been removed and we h ave to disconnect the supply to the building in compliance with these regulations. Roadworks scheduled 15/07/2024 - 19/07/2024 (Cadent) - Traffic control (multi-way signals)
| 15/07/2024 | 19/07/2024 | Cadent |
Impact: Medium | | 15/07/2024 | 28/07/2024 | SP Energy Networks |
Impact: Medium | | 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: Medium | Excavate joint bay with 18m of track in the footway to install and joint cable for new connection to car charging point located on private land. Roadworks scheduled 15/07/2024 - 19/07/2024 (Electricity North West Limited) - Traffic control (multi-way signals)
| 15/07/2024 | 19/07/2024 | Electricity North West Limited |
Impact: Medium | Excavate joint bay with 18m of track in the footway to install and joint cable for new connection to car charging point located on private land. Roadworks scheduled 15/07/2024 - 19/07/2024 (Electricity North West Limited) - Traffic control (multi-way signals)
| 15/07/2024 | 19/07/2024 | Electricity North West Limited |
Impact: High | | 15/07/2024 | 19/07/2024 | SP Energy Networks |
Impact: High | Excavate joint bay in the footway and carriageway to install and joint cable for new connection to car charging point located on private land. Roadworks scheduled 15/07/2024 - 19/07/2024 (Electricity North West Limited) - Traffic control (two-way signals)
| 15/07/2024 | 19/07/2024 | Electricity North West Limited |
Impact: Medium | | 15/07/2024 | 18/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 26/07/2024 | BT |
Impact: Medium | | 15/07/2024 | 26/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 26/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 26/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 26/07/2024 | Cheshire East Council |
Impact: High | Buxton Road, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 15/07/2024 - 17/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | Buxton Road, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 15/07/2024 - 17/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | To provide a safe working area for engineers to access EXISTING telegraph pole(s) to provide fibre overhead cabling for a customer. 4-way lights. 1 working day 0930-1530 ** No Excavation ** Roadworks scheduled 15/07/2024 - 15/07/2024 (BT) - Traffic control (multi-way signals)
| 15/07/2024 | 15/07/2024 | BT |
Impact: High | Moss Brow, Macclesfield. Emergency access will be maintained where possible Road closure scheduled 15/07/2024 - 18/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/07/2024 | 18/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 15/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 17/07/2024 | Cheshire East Council |
Impact: High | | 15/07/2024 | 15/07/2024 | BT |
Impact: High | | 15/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: Medium | | 15/07/2024 | 16/07/2024 | National Highways |
Impact: Medium | | 15/07/2024 | 16/07/2024 | National Highways |
Impact: Medium | S278 - Forming the bellmouth to the new housing development, new footpath, kerbs on either side of bellmouth. Works completed by Chase Town Civil. Emergency phone number 07975612029. Roadworks scheduled 16/07/2024 - 30/07/2024 (Cheshire East Council) - Traffic control (multi-way signals)
| 16/07/2024 | 30/07/2024 | Cheshire East Council |
Impact: Medium | Piece up 315mm, back to back 225mm main after temp connection Roadworks scheduled 16/07/2024 - 18/07/2024 (United Utilities Water)
| 16/07/2024 | 18/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 18/07/2024 | Cadent |
Impact: Medium | | 16/07/2024 | 22/07/2024 | SP Energy Networks |
Impact: High | EXCAVATE JOINT BAY TRACK IN FOOTWAY TO FRONT OF 113 CHEYNE HALL, NANTWICH. LAY 185 CABLE DUCTED ACROSS ROADWAYS Roadworks scheduled 16/07/2024 - 26/07/2024 (SP Energy Networks) - Traffic control (multi-way signals)
| 16/07/2024 | 26/07/2024 | SP Energy Networks |
Impact: High | Heyes Lane, Alderley Edge. Emergency access will be maintained where possible Road closure scheduled 16/07/2024 - 16/07/2024 due to Roadworks / License - Roadworks works (United Utilities Water)
| 16/07/2024 | 16/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 16/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 16/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 18/07/2024 | T-Mobile (UK) Limited |
Impact: Medium | | 16/07/2024 | 28/07/2024 | BT |
Impact: Medium | 1 joint hole in tarmac footway and spoil storage and 37m trenching in tarmac footway and spoil storage and 7m road crossing in tarmac road for supply alteration, under grounding cables, spoil storage Roadworks scheduled 16/07/2024 - 22/07/2024 (Western Power Distribution)
| 16/07/2024 | 22/07/2024 | Western Power Distribution |
Impact: Medium | | 16/07/2024 | 16/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 16/07/2024 | Cheshire East Council |
Impact: Medium | | 16/07/2024 | 16/07/2024 | Cheshire East Council |
Impact: High | | 16/07/2024 | 16/07/2024 | BT |
Impact: High | Long Lane, Nantwich. Emergency access will be maintained where possible Road closure scheduled 16/07/2024 - 16/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 16/07/2024 | 16/07/2024 | Cheshire East Council |
Impact: Medium | | 16/07/2024 | 17/07/2024 | United Utilities Water |
Impact: High | | 16/07/2024 | 16/07/2024 | BT |
Impact: Medium | To provide a safe working area for engineers to access EXISTING telegraph pole(s) to provide fibre overhead cabling for a customer. 2 way lights. 1 working day 0930-1530 ** No Excavation ** Roadworks scheduled 16/07/2024 - 16/07/2024 (BT) - Traffic control (two-way signals)
| 16/07/2024 | 16/07/2024 | BT |
Impact: Medium | | 16/07/2024 | 17/07/2024 | United Utilities Water |
Impact: Medium | | 16/07/2024 | 17/07/2024 | United Utilities Water |
Impact: High | | 16/07/2024 | 20/07/2024 | National Highways |
Impact: Medium | | 16/07/2024 | 17/07/2024 | National Highways |
Impact: Medium | Excavate to install approx. 8m telecoms duct between existing telecoms chambers, to link into existing telecoms apparatus Roadworks scheduled 17/07/2024 - 19/07/2024 (Zzoomm PLC) - Traffic control (multi-way signals)
| 17/07/2024 | 19/07/2024 | Zzoomm PLC |
Impact: High | | 17/07/2024 | 23/07/2024 | United Utilities Water |
Impact: High | | 17/07/2024 | 18/07/2024 | BT |
Impact: Medium | | 17/07/2024 | 19/07/2024 | BT |
Impact: High | | 17/07/2024 | 19/07/2024 | SP Energy Networks |
Impact: Medium | | 17/07/2024 | 31/07/2024 | SP Energy Networks |
Impact: High | | 17/07/2024 | 01/08/2024 | Cheshire East Council |
Impact: High | | 17/07/2024 | 01/08/2024 | Cheshire East Council |
Impact: High | | 17/07/2024 | 22/07/2024 | Cheshire East Council |
Impact: High | | 17/07/2024 | 19/07/2024 | Cheshire East Council |
Impact: High | Shavington Bypass, Nantwich. Emergency access will be maintained where possible Road closure scheduled 17/07/2024 - 22/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 17/07/2024 | 22/07/2024 | Cheshire East Council |
Impact: High | | 17/07/2024 | 22/07/2024 | Cheshire East Council |
Impact: Medium | | 17/07/2024 | 18/07/2024 | National Highways |
Impact: Medium | Remove all vegetation growing from the faces of the structure including wing walls and abutments. Remove all root systems where possible and if not treat to prevent regrowth. 22:00 - 06:00 Roadworks scheduled 17/07/2024 - 19/07/2024 (Network Rail Infrastructure Ltd) - Traffic control (two-way signals)
| 17/07/2024 | 19/07/2024 | Network Rail Infrastructure Ltd |
Impact: Medium | | 17/07/2024 | 18/07/2024 | National Highways |
Impact: High | Chamber access to link into existing telecoms apparatus as part of larger fibre to the premises scheme. with potential small excavation to locate and repair damaged/blocked telecoms duct. Roadworks scheduled 18/07/2024 - 22/07/2024 (Zzoomm PLC) - Traffic control (multi-way signals)
| 18/07/2024 | 22/07/2024 | Zzoomm PLC |
Impact: Medium | | 18/07/2024 | 22/07/2024 | BT |
Impact: Medium | | 18/07/2024 | 24/07/2024 | SP Energy Networks |
Impact: Medium | | 18/07/2024 | 18/07/2024 | United Utilities Water |
Impact: Medium | | 18/07/2024 | 18/07/2024 | United Utilities Water |
Impact: High | Holmes Chapel Road, Sandbach. Emergency access will be maintained where possible Road closure scheduled 18/07/2024 - 18/07/2024 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/07/2024 | 18/07/2024 | Cheshire East Council |
Impact: High | | 18/07/2024 | 18/07/2024 | Cheshire East Council |
Impact: Medium | | 18/07/2024 | 19/07/2024 | National Highways |